Skip to main content

Shannon Navigation & Royal Canal: Lifting Bridge Restrictions – Abbott Longford Marathon Sunday, 30 August 2026

Marine Notice No. 97 of 2026

Waterways Ireland wishes to advise all masters and users that, to facilitate the annual Abbott Longford Marathon road race on Sunday, 30 August 2026, lifting bridge operations will be restricted as follows:

Royal Canal – Begnagh Bridge Closed: 07:30 to 10:00 hrs

  • Contact: Lock Keeper at +353 (0)87 915 1400

Shannon Navigation – Tarmonbarry Bridge Closed: 08:45 to 12:00 hrs

  • Air draft at Ordinary Summer Level: 7’9” (2.35m)
  • Alternative route via the Camlin River is available
  • Contact: Lock Keeper at +353 (0)43 332 6117

Shannon Navigation – Rooskey Bridge Closed: 09:30 to 12:45 hrs

  • Air draft at Ordinary Summer Level: 10’0” (3.025m)
  • Air draft gauges are in place on both approaches
  • Contact: Lock Keeper at +353 (0)71 963 8018

Bridge operations at each location will resume as soon as the final runner has passed.  Such closures are rare, and Waterways Ireland greatly appreciates the patience of boaters in supporting this important community event.
 
Further information is available here: Abbott Longford Marathon 2026 

Peter Harty
Inspector of Navigation
Inspectorate.Athlone@waterwaysireland.org