Waterways Ireland | News Centre | Marine Notices | Marine Notice Article
PAGE TRANSLATED BY Google Translate

Posted: 28/02/2023

Marine Notice No 10 of 2023 - Grand Canal - 12th lock to 13th lock - Lowered water level - From Fri 3rd March 2023 for two weeks

Notice Number 10 of 2023

MARINE NOTICE
No 10 of 2023

Grand Canal

12th lock to 13th lock

Lowered water level

From Fri 3rd March 2023 for two weeks

Waterways Ireland wishes to advise Masters of Vessels and users of the Grand Canal that construction of the greenway is ongoing.

The water level on the Grand Canal on the 12th Level between Lock 12 Lucan Road and Lock 13 Ardclough from Friday 3rd March for a period of 2 weeks. The water is to be lowered by 200mm to accommodate stone works under Aylmer’s Bridge, Kearneystown as part of the ongoing Kildare County Council Phase 1 Greenway works and follows on from Marine Notice 104 of 2022.

Waterways Ireland thanks Master of Vessels and canal users for their understanding in relation to this matter.

P Harkin
Inspector of Navigation
Waterways Ireland
28 Feb 2023

“Waterways Ireland, managing and promoting the inland waterways for the benefit of all…”


Back to top