MN_37_2022_Erne System_ Bellanaleck Slipway, Quay and Jetty_25 April 2022

Notice Number 37 of 2022

MARINE NOTICE
No 37 of 2022

Erne System

Bellanaleck Slipway - Quay and Jetty Closure

Works to reduce river bed levels – 25th to 26th April 2022

Waterways Ireland wishes to advise Masters of Vessels and waterway users on the Erne System that works to reduce river bed levels on the approach to Bellanaleck Slipway are planned from 07:00hrs Monday 25th April to 18:00hrs Tuesday 26th April inclusive.

During this time the following areas of the Bellanaleck site will be closed for mooring and navigation:
• Slipway
• One half of the floating jetty
• The area of water between the public jetty and private marina


Waterways Ireland thanks its customers for their cooperation.

P. Harkin
Inspector Of Navigation,
Waterways Ireland.
21 April 2022