Skip to main content

Shannon–Erne Waterway Winter Closure for Essential Maintenance

Marine Notice No. 112 of 2026

Waterways Ireland advises masters of vessels that sections of the Shannon–Erne Waterway will close from 2 November 2026 to facilitate essential winter maintenance works in advance of the 2027 boating season.  Works and closures are as follows:

Locks 8 to 10. The Shannon–Erne Waterway between Lock 8 and Lock 10 will close from 2 November 2026 for approximately three months. Works will include:

  • Debris removal
  • Maintenance of sluices
  • Maintenance of lock gates
  • Repairs to lock masonry

Lock 1. Works at Lock 1 will commence on 16 November 2026 for approximately three months. These works will include upgrades to the existing lock hydraulic and electrical operating systems.

Masters of vessels should plan their journeys accordingly and comply with local site safety requirements. Waterways Ireland appreciates the cooperation of all waterway users while these essential works are undertaken and apologises for any inconvenience caused.

Peter Harty
Inspector of Navigation
Inspectorate.Athlone@waterwaysireland.org